UptoPlay - Juegos Online
UptoPlay favicon

UptoPlay favicon


Cyber Dots 3D: flow lines game play online

Free play online Cyber Dots 3D: flow lines game  APK

Cyber Dots 3D: flow lines game

The official app & game

Distributed by UptoPlay

 

SCREENSHOTS

 

DESCRIPTION

Play this online game named Cyber Dots 3D: flow lines game .

Cyber Dots 3D: flow lines game is pixiegames,cyberdots,puzzle, content rating is Everyone (PEGI-3). This app is rated 5 by 1 users who are using this app. To know more about the company/developer, visit Pixie Games Mobile website who developed it. com.PixieGames.CyberDots.apk apps can be downloaded and installed on Android 2.3.x and higher Android devices. The Latest Version of 1 Available for download. Download the app using your favorite browser and click Install to install the application. Please note that we provide both basic and pure APK files and faster play online speeds than APK Mirror. This app APK has been downloaded 25+ times on store. You can also play online com.PixieGames.CyberDots APK and run it with the popular Android Emulators.

Cyber Dots is a flow lines game, where you will need to сonnect the dots in amazing 3d world.

Learning to play is pretty simple. To create a flow you need to connect two dots of the same color with a line, when all the dots on the field will be with the flow, you will pass the level! 

In Cyber Dots to earn three stars is necessary to fill the entire field of colored lines and connect the dots with same colors.

Features,

* 1000 levels model for you;

* All ages can use it;

* Sci-Fi 3d world and cool sound;;

* HD graphic;

* You can change 5 different themes;

* Dots Labels mode activate in Settings Menu;

* Share your progress on facebook;

In the Cyber Dots : flow lines game , you will come across 1000 different levels, on 50 different platforms an interesting game mode with a white dot, where you will need to repaint it in any color as you wish to place the white point in the closed area. The closed area is located inside the effect on the playing field. 


Updates:



 

Cyber Dots 3D: flow lines game from UptoPlay.net


Page navigation: